Village of Plainfield · (815) 439-2937

Code and inspections

Schedule by 3:00 p.m. the day before. Cancel after 8:30 a.m. the day of and you pay a reinspect. Keep the stamped plan and this wall section on site.

Basement wall section

Values to put on the village form. Floor-to-joist lives on this drawing so it is not easy to bump.

Basement wallEXISTING CONCRETESLABJOISTDouble top plate2×4 @ 16″ OCR-13 + 1″ XPSPT plate + sealer
Draftstop
½″ drywall at top plate / joists
Studs
2×4 wood, 16″ on center
Insulation
Cavity R-13 + continuous R-5 (1″ XPS)
Air space
0″ (foam against concrete)
Bottom plate
2×4 pressure-treated on sill sealer
Top plate
Double 2×4, lapped at corners
Ceiling
½″ drywall
Wall finish
½″ drywall (MR board at bath)
Floor
LVT on slab (no subfloor)
Height
8′-0″

Permit packet

Values for the village wall-section form and the addition/remodel worksheet. Roof, sheathing, housewrap, and exterior stay N/A — this is a basement finish. Print or copy before you go to Coil Plus Drive.

Basement wall section · Lee Springer

Draftstopping
½″ drywall at top plate / joists
Wall studs
2×4 wood, 16″ on center
Insulation
Cavity R-13 + continuous R-5 (1″ XPS)
Air space
0″ — foam against the concrete
Bottom plate
2×4 pressure-treated on sill sealer
Top plates
Double 2×4, lapped at corners and intersections
Ceiling finish
½″ drywall
Wall finish
½″ drywall (MR board at bath)
Floor finish
LVT on slab (no subfloor)
Height floor to ceiling
8′-0″ — shortest floor-to-joist

Addition / remodel worksheet

24826 Fieldbrook Drive

NameLee Springer
Address24826 Fieldbrook Drive, Plainfield, IL 60544
Roof coveringN/A — existing house, basement finish
Ice dam / water shieldN/A
Roof sheathingN/A
Roof framingN/A
GuttersN/A — existing
Insulation — ceilingR-49 in joist bays where open to unconditioned space; otherwise existing floor assembly
Insulation — wallsR-13 cavity + R-5 continuous (1″ XPS), or R-19 cavity, or R-15 continuous
Insulation framing2×4 @ 16″ O.C.
Headers2-2×10 on perimeter openings; 2-2×6 on interior doors
Wall sheathingN/A — existing concrete foundation
HousewrapN/A
Exterior wall finishN/A — existing
Treated plate2×4 PT on sill sealer, Tapcons 4′ O.C.
Sill sealerRequired under every PT plate
Interior wall finish½″ drywall (MR board at bath)
Ceiling finish½″ drywall
Floor finishLVT on slab — no subfloor
SubfloorN/A
Floor framingN/A — existing slab
Ceiling joistsExisting — do not cut
Smoke / CO110V interconnected smokes: bedroom, outside bedroom, this level. CO within 15′ of sleeping room.
ElectricalAll basement wiring in EMT / rigid conduit. GFCI within 6′ of water and all basement receptacles.
HeatingExisting furnace in storage — extend supply. Do not box it in. Combustion air required.

What will fail you

IRC R310

Bedroom needs an emergency escape opening

A basement sleeping room must have an egress window or door to the outside. Net clear opening 5.7 sq ft (5.0 if a grade-level opening), 24″ min height, 20″ min width, sill ≤ 44″ above the finished floor. A window well needs 9 sq ft of clear area and a ladder if deeper than 44″. Do not frame the north bedroom wall closed until this is resolved — cutting a well later means opening a finished wall.

IRC R314 / R315 · Village note

Hardwired, interconnected smoke + CO

110-volt smoke alarms, series-wired and interconnected: one in the bedroom, one outside it, one on this level. Carbon monoxide within 15 ft of every sleeping room. Add them at rough-in, not as an afterthought.

Plainfield electrical amendment

Basement wiring is in conduit

Village rule: in basements, exposed extensions or additional outlets shall be in rigid conduit or EMT. NM (Romex) stapled to studs is the usual method elsewhere — not here. Budget EMT, connectors, and bends for every run. Flexible from basement to the floor above cannot exceed 18″.

NEC 210.8 · village amendment

GFCI within 6 ft of water and all basement receptacles

All basement convenience receptacles are GFCI. Dedicated single devices for sump, ejector, and furnace are excepted by village amendment. Bath: GFCI + an exhaust fan ducted outdoors.

IECC · Plainfield wall-section form

Basement wall insulation — Zone 5A

R-15 continuous, or R-19 cavity, or R-13 cavity plus R-5 continuous. The 2×4 path that fits this house: 1″ XPS against the concrete (R-5) + R-13 kraft in the studs. Foil/kraft faces the warm (inside) side. The village form also allows cavity R-19 or continuous R-15.

IRC R317 / R602 · village worksheet

Treated bottom plate, lapped top plates, 16″ OC

Every plate on the slab is pressure-treated, on sill sealer. Studs 16″ on center. Top plates lapped at corners and intersections. Headers: village addition worksheet calls 2-2×10 — use that on the perimeter; interior swing doors can be 2-2×6.

Village basement wall section

Draftstop the top of the wall

½″ drywall (or approved equivalent) at the top plate against the joists. This is inspected. Fireblock foam at plumbing and electrical penetrations. Do not leave a chimney of open bays into the floor above.

IRC R403.1.6 practice · village 6′ OC note

Anchor the bottom plate

¼″ Tapcons or equivalent every 4 ft, two at each plate end, 2″ in from the end. Predrill. The village ½″ plate-bolt / 6′ OC note is for mudsills on new foundation — for furring, masonry screws at 4 ft are the field standard and will pass if they're in, tight, and not shot into the edge of the slab.

IRC R305

Ceiling height

Habitable rooms 7′-0″ min. Beams and ducts can drop to 6′-4″ over a sliver of the room. Measure floor-to-joist in several spots and set stud length from the shortest. Slab isn't level.

Illinois Plumbing Code · IRC R303

Bathroom

The rough-in already exists. Exhaust fan to exterior, GFCI, 20-amp bath circuit, tempered glass if a pane is in a tub wall. Moisture-resistant drywall (green/purple board or cement board) at the wet wall — later, not this week.

IFGC · IMC

Don't box in the furnace

The furnace and water heater stay in storage. They need combustion air and 30″ of service clearance. A louvered door or a transfer grille high and low. If you starve the furnace you'll fail final and, worse, you'll make CO. Do not build a separate mechanical room.

Village of Plainfield Building Department

Permit before you snap a line

A basement finish is a permit job: plans, wall section, and the inspection list. Cut-off for scheduling is 3:00 p.m. the day before. Cancel after 8:30 a.m. the day-of and you pay a reinspect. Phone (815) 439-2937. 14400 S. Coil Plus Drive.

Inspection card

Footing, foundation, and garage items from the village remodel list do not apply unless you add an egress well (that well gets its own footing).

  • Permit issued / plans on sitegeneral

    Before work · Stamped drawings and the wall section stay on the job.

  • Plumbing undergroundplumbingas needed

    Only if you move drains · Skip if you use the existing rough-in as-is.

  • Electrical undergroundelectricalas needed

    Only new exterior/egress circuits · Usually N/A on an interior finish.

  • Plumbing rough-inplumbing

    Before insulation · Bath DWV, water, vent. Illinois plumbing code.

  • Electrical rough-inelectrical

    Before insulation · EMT, boxes, smokes roughed. All in conduit.

  • Building rough-inbuilding

    Framing complete, trades in · Walls plumbed and fastened, headers bearing, draftstop in. HVAC is looked at on this visit.

  • Insulationbuilding

    After roughs pass, before drywall · R-value continuous/cavity as on the wall section. Kraft face inside.

  • Plumbing finalplumbing

    Fixtures set · Bath complete, no leaks.

  • Electrical finalelectrical

    Devices on, covers on · GFCI trip, smokes interconnected, panel labeled.

  • Building finalbuilding

    Move-in condition · CO alarms within 15 ft of the bedroom. Handrails, heat working, interior done.

Adopted codes

  • Building
    2021 International Residential Code
  • Energy
    IECC — Illinois current residential edition (Zone 5A)
  • Electrical
    2020 NEC + Village of Plainfield amendments
  • Plumbing
    2014 Illinois Plumbing Code + village IDPH amendments
  • Mechanical
    2021 IMC / IFGC + village amendments
  • Existing
    2021 International Existing Building Code

14400 S. Coil Plus Drive, Plainfield, IL 60544 · Building Department · This is a field companion, not a substitute for the stamped permit set.

Confirm 7′-3″ east of F17 on the slab. Then cut P2.

Snap P2